Tunnels

Overview

Arazim Tunnel was built on Road 9 in Jerusalem.

As part of this project, 2 parallel tunnels were built.

In this project, Ardan Projects erected an electricity plant that includes jet blowers, electricity room with a generator backup, and laying out fibres throughout the entire tunnels in order to control the traffic to Jerusalem’s main operators.

More Information

Installation of jet blowers that were installed in the ceiling.

Establishing an electricity room with underground cable exits, which are placed on ladders made of fiberglass.

Electricity room - main board backed up by a generator.

Optic fibres were deployed to the control system. These fibres, which were deployed over 15 kilometres, are connected to the main transport control room in Jerusalem through the existing trenches found throughout the entire length of all roads.